Solving constructability issues of 2.2 km-long boardwalk under Hong Kong highway

Hong Kong | Hong Kong | Tony Gee und Partner
The Island Eastern Corridor Boardwalk (IEC) project in Hong Kong required significant changes due to constructability limitations under the existing viaduct. Engineering consultancy company Tony Gee and Partners resolved geometry, connection, and material efficiency challenges through precise modeling and verification of non-standard steel connections.
Detailed 3D modeling of realistic connection geometry allowed us to simulate exact member arrangements, including offsets, different levels, and angles – something conventional tools could not visualize accurately.
Mohammad Elayyan
General Manager (Associate) – Tony Gee und Partner

The project and redesign

inline image in article

A pedestrian boardwalk beneath the Island Eastern Corridor elevated highway is a 2.2 km long landmark improving connectivity and accessibility along Victoria Harbour.

The original design hit a wall due to construction limitations. Two main elements were re-designed to solve construction issues: a part of the boardwalk designated as Span 38, and a fishing platform.

That's why Tony Gee and Partners created a new design. They are specialist consultants, mostly working with contractor clients and their strength is in focus on constructability of designs: they help the contractors through construction engineering and methods, along with adopting technologies to ensure sustainability and efficiency in costs and time.

Component-Based Finite Element Method (CBFEM) enabled a deeper understanding of stress flow through each plate and bolt, even in highly eccentric or asymmetrical configurations, eliminating guesswork in complex connections.
Mohammad Elayyan
Tony Gee and Partners – Tony Gee und Partner

Redesign of Span 38

The original design included four pre-bored socketed steel H-profile piles beneath IEC bridge deck. But it faced installation challenges due to limited clearance under the road bridge – the pile rigging machine could not be operated safely and efficiently.

That’s why Tony Gee and Partners replaced socketed H-piles with RC monopiles, and redesigned spans for constructability. They introduced new steel framing system to transfer boardwalk load to existing IEC pile caps.

Precise boundary condition assignment flexibly modeled moment-resisting, pinned, and partially restrained connections. It accurately reflected real support conditions, improving reliability of results.
Mohammad Elayyan
General Manager (Associate) – Tony Gee und Partner

Redesign of the fishing platform

Originally, the project assumed new piles supporting full RC superstructure. The design included 10 additional piles under the fishing platform area.

To create a lighter superstructure, the redesign introduced a steel superstructure with RC slabs, and the replacement of the RC frame by steel-concrete I-beams. This created a span with approximately 25.4 meters between column stubs, and an 11-meter overhang forming the fishing platform. 

In the new design, steel I-beams are connected to short steel column stubs, which are supported by IEC bridge pilecaps. These crucial changes in geometrical shape and structural materials used offered a new solution in those cramped spaces, but also created new challanges for steel connections. The designs had to reflect the complexity of the whole structure geometry and spatial possibilities for erection on site.

With accurate force distribution and utilization checks, we avoided over-conservative designs. This led to lighter connections, reduced steel usage, and faster fabrication.
Mohammad Elayyan
Tony Gee and Partners – Tony Gee und Partner

Ensuring quick delivery and handover

High-quality 3D images, stress maps, and deformation visuals were used for design meetings, approvals, and even workshop discussions, which reduced miscommunication between the structural engineers, and the reviewers and fabricators.

As Mohammad Elayyan describes: “Connection modifications due to contractor or site constraints could be updated quickly. The design-check loop became significantly faster without compromising code compliance.”

Thanks to IDEA Statica’s ability to modify designs without the need to start from scratch to implement proposed changes, the review process was shortened significantly.

Incorporating IDEA StatiCa to company workflow

As used to be a standard, engineers at Tony Gee and Partners were using spreadsheets and hand calculations for connection design – apart from very complex cases, where they used FEA tools that were not practical for this use-case.

To solve these issues, they have tried IDEA Statica. “To make sure they can rely on IDEA StatiCa for their calculations, Tony Gee and Partners have have double-checked and verified the outcomes of IDEA StatiCa, and the results were fantastic,” says Mohammad Elayyan.

IDEA StatiCa is doing great job with very complex design of connections, and at the same time it's very simple and user friendly. In 1 or 2 days you could start modeling very complex connections.
Mohammad Elayyan
General Manager (Associate) – Tony Gee und Partner

And how will the future of using CBFEM method and IDEA StatiCa look like at Tony Gee and Partners? “I see that there are some quite nice improvements coming especially in the detailing and the concrete part, and I'm looking forward to adopt that in the future,” says Mohammad, who has come from bridge design background and is thus interested in what capabilities IDEA StatiCa has to offer there.

Try IDEA StatiCa for free

Start your trial today and enjoy 14 days of full access and services free of charge.
Tony Gee und Partner

Tony Gee und Partner

Tony Gee kann auf eine beeindruckende, über 50-jährige Geschichte in der technischen Beratung zurückblicken. Das Unternehmen begann 1974 mit der Entwicklung von Vortriebssystemen für Ölplattformen in der Nordsee und Vorspannsystemen für freitragende Brücken mit Segmenten. Zu unseren ersten Projekten gehörten eine innovative Flossenbrücke in Texas und ein symbolträchtiger Auftrag für die Konstruktion einer Deckmontagebrücke für die neue Brücke über den Fluss Orwell in Suffolk (alle 600 Tonnen!). Detail